Stream Bank Stabilization Prev | Next The stream bank before stabilization Prev | Next The stream bank before stabilization Prev | Next A coffer dam is built with a bridge on which to set the machine Prev | Next The stream bed is not altered or contaminated during work Prev | Next Stones are placed for retaining wall Prev | Next Stones are placed for retaining wall Prev | Next The stones are fit as tightly together as possible Prev | Next Backfill is used for stability and drainage Prev | Next An upper wall is built to create a terraced back yard Prev | Next An upper wall is built to create a terraced back yard Prev | Next An upper wall is built to create a terraced back yard Prev | Next Small steps join the new back yard to the upper stone wall Prev | Next A clean edge overhangs the stream Prev | Next The upper and lower walls have created a level, stable back yard Prev | Next Trees have been planted at the base of the bottom wall Prev | Next The stabilized stream bank creates a safe, usable back yard Prev | Next Prev | Next Prev | Next Prev | Next Prev | Next