Stream Bank Stabilization



Prev | Next

The stream bank before stabilization

Prev | Next

The stream bank before stabilization

Prev | Next

A coffer dam is built with a bridge on which to set the machine

Prev | Next

The stream bed is not altered or contaminated during work

Prev | Next

Stones are placed for retaining wall

Prev | Next

Stones are placed for retaining wall

Prev | Next

The stones are fit as tightly together as possible

Prev | Next

Backfill is used for stability and drainage

Prev | Next

An upper wall is built to create a terraced back yard

Prev | Next

An upper wall is built to create a terraced back yard

Prev | Next

An upper wall is built to create a terraced back yard

Prev | Next

Small steps join the new back yard to the upper stone wall

Prev | Next

A clean edge overhangs the stream

Prev | Next

The upper and lower walls have created a level, stable back yard

Prev | Next

Trees have been planted at the base of the bottom wall

Prev | Next

The stabilized stream bank creates a safe, usable back yard